In the summer of 2001, the structure was then dismantled and transported on 35 lorry loads to Falkirk, before all being bolted back together again on the ground, and finally lifted by crane in five large sections into position. The total 600 tonne weight of the water and boat filled gondolas imposes immense and constantly changing stresses on the structure as it turns around the central spine. Normal welded joints of steel would be susceptible to fatigue induced by these stresses, so to make the structure more robust, the steel sections were bolted together. Over 15,000 bolts were matched with 45,000 bolt holes, and each bolt was hand tightened.